Home > Industry Projects > Surveillance / Patrol Aircraft > Mineseeker
The mooring mast on the left side of the photograph can be erected in 20 minutes so the airship is easily positioned close to the area of interest.
Copyright 2008 SPG Media Limited a subsidiary of SPG Media Group PLC